Factory Acceptance Testing for Battery Production Equipment

Before shipment, your machine or line runs with your products in our factory and is checked against the acceptance criteria agreed at the start: cycle time, welding results, test stations and safety functions.

See What We Verify
Battery PACK production line ready for factory acceptance testing

Why Verify the Line Before It Ships

Fixing a problem at our factory takes days. Fixing it after the line is installed in yours can take weeks.

Verify What Was Agreed

Every check is measured against the acceptance criteria written into the equipment scope, not against a general demo.

Tested with Your Products

The line runs with your cells, busbars and parts, so fixtures, positioning and welding are proven on the real product.

Faster Start-Up on Site

A line that has already passed FAT needs less adjustment during installation and commissioning at your factory.

What We Verify During FAT

The exact checklist depends on your equipment scope. These are the areas a typical battery PACK line FAT covers.

Cycle Time & Output

Complete cycle measured with your products, including loading, positioning, processing, inspection and unloading.

Welding Results

Welds checked against the criteria set during the welding trial: appearance and, where agreed, strength, resistance or cross-section.

OCV & Internal Resistance

Test station readings, sorting logic and automatic NG rejection verified with real cells.

Insulation & EOL Testing

Insulation and end-of-line test stations checked for correct results, limits and data output.

Safety Functions

Emergency stops, guarding, door interlocks and laser safety enclosures tested one by one.

Traceability & Changeover

Barcode scanning, data records and recipe-based product changeover checked for each agreed product variant.

How FAT Works

01

Agree Acceptance Criteria

Cycle time, quality checks and test items are written into the equipment scope before production starts.

02

Prepare Test Products

Your cells, busbars and parts are prepared for the test run.

03

Run and Measure

The line runs with your products while each item on the checklist is tested and recorded.

04

Review and Sign Off

You review the results. Any open items are listed, corrected and re-checked before sign-off.

05

Pack and Ship

After sign-off the equipment is packed for shipment, followed by installation, commissioning and operator training at your site.

What You Receive After FAT

FAT Checklist & Results

Every agreed item with its measured result.

Test Data Records

Cycle time, test station and welding data from the run.

Photos & Video

A visual record of the line running with your products.

Open Items & Sign-Off

Any open items, how they were closed, and the signed acceptance record.

One Step in a Verified Project

FAT confirms what the welding trial proved and what the equipment scope promised, before the line leaves our factory.

Factory acceptance testing

Define Your Acceptance Criteria Early

Tell us your product, target output and quality requirements, and we will build the FAT checklist into your equipment scope. Jack will reply within 2 hours.